Air & Noise Sampling

Air Sampling

Exposure monitoring you can defend.

What you get

From the sampling plan to the lab to the Technical Compliance Report. Baseline, periodic, and complaint-driven monitoring. The lab’s standard turnaround is three weeks; we issue your final Technical Compliance Report within one week of those results — typically one month after we leave the site.

  • Sampling plan and strategy
  • On-site collection
  • Accredited lab analysis (standard TAT: 3 weeks)
  • Technical Compliance Report within 1 week of lab results
  • Interpretation against OELs